Full re-roofs, stripped and re-laid to last

A full strip and re-tile done properly: old coverings off, timbers inspected, new breathable membrane and battens down, then slate or tile laid in clean courses with an all-new dry ridge system on top, so there is no mortar to crack and nothing to maintain. With 17 years on North Yorkshire roofs we know what the weather up here does to a cheap job, and we do not leave one behind.

Free quotes · Fully insured · 17 years’ experience

Full re-roof in progress, new tiles going down, JP Roofing & Building
Full re-roof in progress, new tiles going down
What’s included

Every re-roof, covered.

Full Strip & Re-Tile

Old tiles and felt off, roof timbers checked and repaired, new membrane, battens and coverings laid in clean, even courses.

All-New Dry Ridge

Mechanically fixed dry ridge systems as standard, so the ridge is screwed and clipped down, not bedded in mortar that cracks. Maintenance free.

Timber & Structure Checks

Rafters, laths and wall plates inspected once the roof is open, with any rot or damage priced and fixed before the new roof goes over it.

Tidy Site, Every Day

Scaffold arranged, old materials away in a skip, gutters cleared and the drive swept. You would not know we had been except for the roof.

Questions

Asked and answered.

How do I know if I need a re-roof rather than a repair?

A few slipped or cracked tiles is a repair. Widespread nail fatigue, tiles delaminating across the whole slope, daylight through the felt or a ridge that moves in the wind usually means the roof has reached the end of its life, and repairing it becomes a rolling cost. We look, tell you which one you have and quote for that, not for the biggest job we can think of.

What is a dry ridge system and why do you fit one?

A dry ridge fixes the ridge tiles down mechanically with screws, clamps and a ventilated roll instead of bedding them on mortar. Mortar cracks with frost and movement and ends up needing repointing every few years; a dry ridge does not. It also ventilates the roof space, which cuts condensation. We fit an all-new dry ridge system on our re-roofs as standard, so the top of the roof is maintenance free.

How long does a re-roof take?

A typical three-bed semi runs about a week from scaffold up to scaffold down, depending on the weather and what we find under the old coverings. Larger roofs, multiple pitches and structural repairs add time. The roof is never left open overnight; each section is stripped, felted and made weathertight the same day.

Can you match the tiles on my street?

Almost always. Pantiles, plain tiles, concrete interlockers and natural slate are all still made in the common profiles and colours, and reclaimed tiles cover the rest. We bring samples up rather than asking you to choose from a website photo.

Do I need planning permission for a re-roof?

Usually not, a like-for-like re-roof is normally permitted development. Conservation areas and listed buildings are the exception, where the covering may have to match what came off. We work around Bedale, Richmond and the Dales, so it comes up regularly and we will tell you straight if your house is affected.

Is the work guaranteed?

Yes. The workmanship is guaranteed and the materials carry their manufacturers’ guarantees on top, and membranes and dry ridge systems are specified from proper merchants, not whatever is cheapest that week. You get it in writing with the quote.

Coverage

Re-Roofs across the patch.

Free quotes

Planning a re-roof?

Send a photo of the job on WhatsApp or give Josh a ring. Quotes are free and straight.

Contact

Get a free quote.

Phone

 
Josh answers, not an office

WhatsApp

Message with a photo
Quickest way to a quote

Based in

Bedale, North Yorkshire
Covering the North East