Single and double storey extensions, garage conversions and structural alterations, built from the footings up by one team that also puts the roof on. Most builders sub the roof out; most roofers cannot do the building. Having both trades in-house means the job is sequenced properly, the junction between old roof and new is detailed by the people who own it, and you chase one number, not five.
Free quotes · Fully insured · 17 years’ experience

Kitchen extensions, side returns and full double-storey additions, from groundworks and drainage to plaster-ready walls.
Pitched or flat, tiled to match the house, flashed into the existing roof properly, by our own roofing side, not a sub.
Openings knocked through, steels in, walls removed and floors levelled, with building control involved from the start.
The shell up and dried in before the trades that follow, so the programme does not stall at the first week of rain.
Many single-storey extensions fall under permitted development if they stay within the size limits; double storeys and anything forward of the house usually need an application. Conservation areas around the Dales villages tighten the rules. We will tell you which side your plans fall on, and work with your architect or recommend one.
A straightforward single-storey kitchen extension typically runs 10 to 14 weeks from breaking ground to plastered; double storeys longer. Weather affects the early weeks, which is why we push to get the shell up and the roof on quickly, our own roofing team helps there.
Yes. The job is built to the approved drawings, inspections are booked at the right stages, and you end up with the completion certificate you will need when you sell. It is routine for us, not an extra.
That is exactly the sort of detail we care about. Brick match, mortar colour, coursing heights, tile profile and ridge details all get chosen against the existing house, because an extension that matches reads as part of the house and one that does not never stops looking bolted on.
Almost never for an extension. The work is outside the house until break-through, which we leave as late as the programme allows and then seal with dust screens. You will have some noisy days and we will tell you which ones in advance.
Yes, a written quote broken down by stage after we have seen the site and the drawings, with provisional sums flagged clearly where the ground or the existing structure cannot be known until it is opened up. No day-rate drift.
Send a photo of the job on WhatsApp or give Josh a ring. Quotes are free and straight.